New Heemsteder bridge

We received the assignment for the loading, transportation and installation of the new build Nieuwe Heemsteder brug from HSM . The bridge was build on the Jetty of HSM at the Wilhe lmina Harbor in Rotterdam. At this location we moved the bridge in its entirety from the the jetty on to the coupled transport barges by using three Sheerlegs.
Project Details:
Number: | HST-14086 |
Client: | HSM |
Project: | New Heemsteder brug |
Year: | 2015 |
Weight: | 715t |
Site Location: | R'dam / Nieuwegein |
Works Description:
We received the assignment for the loading, transportation and installation of the new build Nieuwe Heemsteder brug from HSM . The bridge was build on the Jetty of HSM at the Wilhe lmina Harbor in Rotterdam. At this location we moved the bridge in its entirety from the the jetty on to the coupled transport barges by using three Sheerlegs. We transported this extremely long load, approximately 250 meters in length, via the river Waal and Amsterdam Rijnkanaal to Nieuwegein. In Nieuwegein we lifted the bridge with the same Sheerlegs from the barge and positioned the new bridge in its final position on the abutments.
Equipment on site:
- 1x Sheerlegs HEBOLIFT 6,200t cap
- 1x Sheerlegs HEBOLIFT 7, 300t cap
- 1x Crane Barge HEBOLIFT 8, 300t cap
- 2x transport barges 65,00 x 11,40mtr
- 1x Anchor barge HEBO P6 63,50 x 11,30mtr
- 2x Push boats
- 2x tugboats
- Several winches in the capacity between 7t and 12t
- Several auxiliary equipment
- Professional crew