Railway bridge Pont des Allemands

We received the assignment for the demolition of the Bridge from Franki. The assignment entailed the lifting, transport and placing on quay of the complete old bridge.
Project Details:
Number: | HST-15079 |
Client: | Frank NV |
Project: | Railway bridge Pont des Allemands |
Year: | 2017 |
Weight: | 4.000t |
Site Location: | Vise(B) |
Works Description:
We received the assignment for the demolition of the Bridge from Franki. The assignment entailed the lifting, transport and placing on quay of the complete old bridge. The bridge was cut in 5 pieces of app 800to/pc. Elements where floated out by barges, cut in smaller pieces and placed by the sheerlegs on shore. The challenges of this project were the narrow working area, swallow draft in combination with the heavy weights.
Equipment on site
- Sheerleg HEBO-Lift 8
- 4 barges
- 2 x pusher tugs
- Mobile crane(s) for assisting works
- Several auxiliary equipment
- Professional crew
Photos: