Salvage Kamper Kogge

portfolio-projecten-salvage-kamper-kogge-klein.jpg

Salvage combination HEBO/ADC/Baars Cipro won the D&C Tender for the salvage, transport, storage and conservation of the Kamper Kogge. As part of a dredging operation on the river IJssel the 15th age Kogge as to be removed on a geological sensible correct way out of the river soil.

Project Details:

Number: HST-15082
Client: Rijkswaterstaat
Project: Salvage Kamper Kogge
Year: 2015-2016
Weight: 120 t.
Site Location: Kampen(NL)


Works Description:

Salvage combination HEBO/ADC/Baars Cipro won the D&C Tender for the salvage, transport, storage and conservation of the Kamper Kogge. As part of a dredging operation on the river IJssel the 15th age Kogge as to be removed on a geological sensible correct way out of the river soil. For this job we engineered special salvage equipment. On location we placed a current protection-lifting frame. Underneath the Kogge we placed 20 lifting sling. These slings where connected on a computer operated lifting system. Inside the ship we placed beams for keeping the original form of the ship during the lifting operation. After a successful salvage operation we transport the ship to a conservation location in Lelystad. Engineering and building of this conservation location was also a part of the project scope. The whole operation was successful executed under a great public interest in a period of 7 months.

Equipment on site:

  • Sheerleg HEBO-Lift 6
  • Tug Avontuur 2
  • Cranebarge P-32
  • Diving Team
  • Salvage equipment / pumps
  • Salvage crew

Photos:

    

Download PDF ››

Labels
Projecten EN

« Terug

Deel dit bericht

Scroll naar boven