Keersluis Limmel

portfolio-projecten-keersluis-limmel-klein.jpg

In an early stage we where involved by the design & construct project Keersluis Limmel. As a part of the tender team we advised Besix and Aelterman for transport and installation solutions. The installation of a bridge(410t) and a retaining wall(200t) was part of a complete make over of the locks of Limmel.

Project Details:

Number: HST-15257
Client: Aelterman NV & Besix BV
Project: Keersluis Limmel
Year: 2016
Weight: 410 & 200t
Site Location: Limmel (NL)


Works Description:

In an early stage we where involved by the design & construct project Keersluis Limmel. As a part of the tender team we advised Besix and Aelterman for transport and installation solutions. The installation of a bridge(410t) and a retaining wall(200t) was part of a complete make over of the locks of Limmel. After our combination won the order, we executed in two faces the load -out, transport and installation work of the bridge, retaining wall and the underwater concrete thresholds. Challenges on this project where the passing of the bridg es on the canals during transport of the retaining wall and the narrow working space inside the Lock. Also the available timeframe for the execution was challenging. All the work was done within the available.

Equipment on site:

  • Sheerleg HEBO-Lift 8
  • 1 inland ships
  • 2 x 12 line SPMT
  • Push-up system JS500
  • 2 x pusher tugs
  • 2 x pontoon type HEBO P39
  • Mobile crane(s)
  • Several auxiliary equipment
  • Professional crew