We received the assignment for the transportation and installation of the Bridge from the client. The assignment entailed load out, transport and lift the bridge on his abutments.

Project Details:

Number: HST-17207
Client: BSB Staalbouw BV
Project: Tafelbrug Zuidhorn
Year: 2017
Weight: 285t
Site Location: Zuidhorn(NL)


Works Description:

We received the assignment for the transportation and installation of the Bridge from the client. The assignment entailed load out, transport and lift the bridge on his abutments. During the transport over the channel we had to pas some lower bridges. Therefore we prepared the bridge for a floating transport. After a period of engineering and preparations, we connected “airbags” under and on the sides of the bridge. The bridge was transported by SPMT from the factory to the quay. We lifted the bridge from the quay into the water by floating sheerlegs. After successful transport we lifted the bridge out of the water and placed them on the existing piles. Challenge for this project was the engineering for transport and to convince the client and authorities of our proposed way of transport.

Equipment on site

  • HEBO-Lift 7
  • Sheerleg HEBO-Lift
  • 2 x 6 line SPMT
  • 2 x pusher tugs
  • Mobile crane(s) for assisting works
  • Several auxiliary equipment
  • Professional crew