PROJECT
Lifting the Trencher Jet-it
Facts & Numbers
WEIGHT
280 TONNES
LOCATION
Amsterdam
YEAR
2026
Home >
Project description
From Deck to Quay: 280 Tonnes Safely Relocated
For a lifting project, an approximately 280-tonne trencher was successfully offloaded from the work vessel Zwerver V and safely placed on the quay.
The lifting operation was carried out using specialist lifting equipment and required meticulous preparation and execution. Thanks to the expertise of our experienced specialists and the use of suitable equipment, the operation was carried out safely and efficiently.