PROJECT

Bridge Installation in Ingelmunster

Facts & Numbers

WEIGHT

166 TONNES

LOCATION

INGELMUNSTER

YEAR

2026

Home > Bridge Installation in Ingelmunster

Project description

Precision Where Space Is Limited

The bridge, weighing 166 tonnes and measuring approximately 80 metres in length, was lifted from an inland vessel and then positioned in its final location. The operation took place in a narrow waterway, with the bridge extending approximately 15 metres beyond the width of the waterway on either side. This required meticulous preparation and precise execution.

Any questions?

For further help, please don’t hesitate to get in touch.

Pictures project

Call for a quotation now

Quotation form

We aim to contact you within 2 working days

    Leave a Reply